Details Of Job Executed
|
Completion Period
|
Name of Client
|
2010-2011
|
Static Equipment and Fabrication job in Coker Plant.
|
Annual Rate Contract
|
Reliance Industries Ltd. Jamnagar
|
Maintenance of Heat Exchangers in Gujarat Refinery
|
Annual Rate Contract
|
Indian Oil Corporation Ltd. Vadodara.
|
Loading Unloading of PACOL Reactor Catalyst in Reactors in LAB Plant at Gujarat Refinery
|
Annual Rate Contract
|
Indian Oil Corporation Ltd. Vadodara.
|
Loading Unloading of Catalyst and Ceramic Balls in CRU Reactors at Gujarat Refinery.
|
15 Days
|
Indian Oil Corporation Ltd. Vadodara.
|
Major Shut Down of Heat Exchangers, Heater Pigging, Columns, Vessels, Fabrication of Structure and Piping and Misc. Job in Coker plant. During Nov. 2010
|
30 Days
|
Reliance Industries Ltd. Jamnagar
|
Shutdown Maintenance job for Columns and Catalyst Loading/Unloading in Oxy Reactors in VC/PVC plant at RIL Dahej.
|
10 Days
|
Reliance Industries Ltd. Dahej, Bharuch.
|
Internal installation of Columns & Reactors, Hydrotesting of Heat exchanger & Vessel & Catalyst Loading in Reactor at HGU & DHDT at IOCL GR site
|
Complete
|
Petron Engineering Const. Ltd. (Indian Oil Corporation Ltd.)
|
2009-2010
|
Static Equipment and Fabrication job in Coker Plant.
|
On Going Jobs Annual Rate Contract
|
Reliance Industries Ltd. Jamnagar
|
Column and Reactor Internal installation, Heat exchanger & Vessel testing and Catalyst Loading in Reactor at IOCL site
|
Complete
|
Petron Engineering Const. Ltd. (Indian Oil Corporation Ltd.)
|
Maintenance & Inspection of Vessels & Heat Exchangers of Crude-II during June 2009 Shutdown |
20 Days
|
Reliance Industries Ltd. Jamnagar
|
Static equipment maintenance, piping, fabrication and erection job during TEME June 2009 shutdown
|
5 Days
|
Reliance Industries Ltd. Jamnagar
|
Miscellaneous Rigging and Static jobs at FCC plant during April 2009 emergency shutdown
|
13 Days
|
Reliance Industries Ltd. Jamnagar
|
Buffing jobs in Coker Pigging Shutdown in April 2009
|
15 Days
|
Reliance Industries Ltd. Jamnagar
|
2008-2009
|
Column and Reactor Internal installation, Heat exchanger & Vessel testing and Catalyst Loading in Reactor at IOCL site.
|
Year
|
Petron Engineering Const. Ltd. (Indian Oil Corporation Ltd.)
|
Static Equipment and Fabrication job in Coker Plant.
|
Annual Rate Contract
|
Reliance Industries Ltd. Jamnagar
|
Pigging Shutdown related job in Coker plant |
35 Days
|
Reliance Industries Ltd. Jamnagar
|
Heat Exchanger maintenance job during FCC May-08 slow down
|
7 Days
|
Reliance Industries Ltd. Jamnagar
|
Maintenance job of Vessels and Condensate pot during May'08 shutdown in VCM plant
|
12 Days
|
Reliance Industries Ltd. Dahej, Bharuch
|
Statutory IBR inspection related job during May'08 shutdown in VCM plant
|
12 Days
|
Reliance Industries Ltd. Dahej, Bharuch
|
Catalyst Loading and Unloading for Oxy reactors in VCM plant during May'08 shutdown
|
12 Days
|
Reliance Industries Ltd. Dahej, Bharuch
|
Removal Refixing job of MPR tube bends in LDPE plant during April'08 shutdown
|
4 Days
|
Reliance Industries Ltd. Baroda.
|
Inside buffing of AS-1006 Column during April'08 shutdown in ACN plant.
|
10 Days
|
Reliance Industries Ltd. Baroda.
|
Maintenance of Column during April'08 shutdown in ACN plant
|
10 Days
|
Reliance Industries Ltd. Baroda.
|
Contract for shutdown maintenance at LAB plant
|
12 Days
|
NIRMA Ltd. Savli, Baroda.
|
Removal Refixing job of MPR tube bends in LDPE plant during April'08 shutdown
|
4 Days
|
Reliance Industries Ltd. Baroda.
|
2007-2008
|
Maintenance job Heat Exchangers in IOP plant during Sept.-Oct.'07
|
12 Days
|
Reliance Industries Ltd. Dahej, Bharuch
|
Maintenance job of Vessels in EO-EG plant during Sept.-Oct.'07
|
12 Days
|
Reliance Industries Ltd. Dahej, Bharuch
|
Maintenance job of Filters, Tanks in EO-EG plant during Sept.-Oct.'07 |
12 Days
|
Reliance Industries Ltd. Dahej, Bharuch
|
Annual Rate Contract of Heat Exchanger Cleaning at Reliance Baroda
|
Annual Rate Contract
|
Reliance Industries Ltd. Baroda.
|
Heat Exchangers/Heater and Vessels maintenance ,Column Inspection and other miscellaneous maintenance job in Aromatic during Dec 07 shutdown
|
20 Days
|
Reliance Industries Ltd. Jamnagar
|
Shut down maintenance job in VCPVC plant during Sept.'07
|
12 Days
|
Reliance Industries Ltd. Baroda.
|
2006-2007
|
Overhauling, Repair & Maint. of Heat Exchangers, Coolers, Condensers and Re - Boilers in B/A at GR.
|
Annual Rate Contract
|
IOCL Gujarat Refinery,
Baroda.
|
Shut Down Maint. Job - Carried out Repair and Maint. Job of Heat Exchangers, Column Towers, Heaters, Vessels, Reactors etc.
|
7 Days
|
Indian Petrochemical Corp. Ltd.,
Baroda.
|
2005-2006
|
Shut Down Maint. Job. Carried out Repair and Maint. Job of Heat Exchangers, Column Towers, Heaters, Vessels, Reactors etc
|
45 Days
|
Reliance Petroleum Ltd., Jamnagar
|
Shut Down Maint. Job VCM Plant at Dahej. Carried out Repair and Maint. Job of Heat Exchangers, Column Towers, Heaters, Vessels, Reactors, Dryers and Filters etc.
|
15 days
|
Indian Petrochemical Corp. Ltd., Dahej, Bharuch.
|
Maint. Job of Hot Oil Heater and Charge Heater
|
7 Days
|
Nirma Ltd., Savli.
|
Overhauling, Repair & Maint. of Heat Exchangers, Coolers, Condensers and Re - Boilers in B/A at GR.
|
Annual Rate Contract
|
IOCL Gujarat Refinery,
Baroda.
|
Heat Exchangers and other Static job in FCC and Aromatics plant
|
45 Days
|
Reliance Petroleum Ltd., Jamnagar.
|
2004-2005
|
Shut Down Maint. Job VCM Plant at Dahej. Carried out Repair and Maint. Job of Heat Exchangers, Column Towers, Heaters, Vessels, Reactors, Dryers and Filters etc.
|
10 Days
|
Indian Petrochemical Corp. Ltd., Dahej, Bharuch.
|
Shut Down Maint. Job during VCM Plant. Carried out Repair and Maint. Jobs of Heat Exchangers,Vessels, Column Towers, Heaters, Reactors and Filters etc.
|
12 Days
|
Indian Petrochemical Corp. Ltd., Baroda.
|
Shut Down Maint. Job of ACN Plant Carried out Repair and Maint. Jobs of Heat Exchangers, Re -Boilers, Column Towers and Reactors.
|
05 Days
|
Indian Petrochemical Corp. Ltd., Baroda.
|
Rate Contract of maintenance of Heat Exchangers
|
Annual Rate Contract
|
Indian Petrochemicals Corporation Ltd. Baroda.
|
Rate Contract for Cleaning of Oxy/Poly reactors, Incinerator and Caustic dryer in VCPVC plant
|
Annual Rate Contract
|
Indian Petrochemicals Corporation Ltd. Baroda.
|
Mechanical Maintenance Jobs Shut Down in VCM Plant at GPC, Dahej. Carried out Repair and Maint. Job of Heat Exchangers, Column Towers, Reactors and Filters etc.
|
10 Days
|
Indian Petrochemical Corp. Ltd., Dahej, Bharuch.
|
Shut Down Maint. Job at GCU. Carried out Repair and Maint. Job of Heat exchangers, Column Towers etc.
|
07 Days
|
Indian Petrochemical Corp. Ltd., Dahej,
Bharuch.
|
Overhauling, Repair & Maint. of Heat Exchangers, Coolers, Condensers and Re - Boilers in B/A at GR.
|
Annual Rate Contract
|
IOCL Gujarat Refinery,
Baroda.
|
Shut Down Maint. Jobs at MGCC. Carried out Repair and Maint. Job of Heat Exchangers, Column Towers, Heaters and Reactors etc.
|
12 Days
|
Indian Petrochemical Corp. Ltd., MGCC,
Nagothane.
|
Work Contract for Replacement of Mixture Rotor of AF Plant. Carried out Job of Replacement of Rubber Roller, S.S Roller, Lower and Upper Bevel Gear Box etc.
|
02 Days
|
Indian Petrochemical Corp. Ltd., Baroda.
|
Maint. Job of Heat Exchanger, Coolers and Condensers during AU - I Shut - Down.
|
10 Days
|
IOCL, Gujarat Refinery, Baroda.
|
Contract for Shut Down Maint. Job at LAB Plant. Carried out Repair and Maint. Job of Heat Exchangers, Column Towers and Heaters etc.
|
07 Days
|
Nirma Ltd.,
Savli.
|
Contract for Shut Down Maint. Job at LAB Plant. Carried out Repair and Maint. Job of Heat Exchangers, Column Towers.
|
07 Days
|
Nirma Ltd., Savli.
|
2003-2004
|
Overhauling, Repair, & Maint. of Heat Exchangers, Coolers, Condensers and Re - Boilers in B/A at GR.
|
Annual Rate Contract
|
IOCL, Gujarat Refinery, Baroda.
|
Work Contract for Shut Down Maint. Job in LAB Plant. Carried out Repair and Maint. Job of Heat Exchangers, Column Towers, Heaters, and Reactors etc.
|
15 Days
|
Indian Petrochemical Corp. Ltd., Baroda.
|
Shut Down Maint. Jobs at EO/EG Plant. Carried out Repair and Maint. Job of Heat Exchangers, Column Towers, Heaters, and Reactors etc.
|
7 Days
|
Indian Petrochemical Corp. Ltd., Dahej, Bharuch
|
Shut Down Maint. Job of VCM Plant. Carried out Repair and Maint. Job of Heat Exchangers, Column Towers and Heaters, Reactors, Filters, Vessels, Agitators etc.
|
5 Days
|
Indian Petrochemical Corp. Ltd., Dahej, Bharuch.
|
Maint. Cleaning, Hydrotest and IBR Inspection of Boilers.
|
Annual Rate Contract
|
Indian Petrochemicals Corporation Ltd. Baroda.
|
2002-2003
|
Overhauling, Repair and Maint. of Heat Exchangers, Coolers, Condensers and Re - Boilers in B/A at Gujarat Refinery.
|
Annual Rate Contract
|
Indian Petrochemical Corp. Ltd., Dahej, Bharuch.
|
Shut Down Maint. Job at GCU. Carried out Repair and Maint. Job of Heat exchangers, Column Towers etc.
|
07 Days
|
Indian Petrochemical Corp. Ltd., Dahej,
Bharuch.
|
Overhauling, Repair & Maint. of Heat Exchangers, Coolers, Condensers and Re - Boilers in B/A at GR.
|
Annual Rate Contract
|
IOCL Gujarat Refinery,
Baroda.
|
Shut Down Maint. Jobs at MGCC. Carried out Repair and Maint. Job of Heat Exchangers, Column Towers, Heaters and Reactors etc.
|
12 Days
|
Indian Petrochemical Corp. Ltd., MGCC,
Nagothane.
|
1993-1999
|
Cleaning by Grit Blasting and Loading of Catalyst in EO Reactor of EO-EG Plant at IPCL, GPC Complex, Dahej. Under Scientific Design Inspection.
|
15 Days
|
Indian Petrochemical Corp. Ltd.,Dahej,
Bharuch.
|
Opening, Cleaning, Boxing up and Testing of Column, Drums and Heat Exchangers in VC/PVC and O&U unit of PVC Plant at Ratnagiri.
|
7 Days
|
Finolex Industries Ltd., Ratnagiri. Maharastra.
|
Shut Down Maint. Job in LAB. Carried out Repair and Maint. Job of Heat Exchangers, Column towers and Heaters etc.
|
15 Days
|
Indian Petrochemical Corp. Ltd., Baroda.
|
Shut Down Maintenance Jobs Catalyst Loading, Unloading in Reactor at Nirma Ltd., Under UOP Inspection.
|
7 Days
|
Nirma Ltd.,
Savli.
|
Catalyst Loading, Unloading in Reformer (Tubular type Reactor) at Indian Oil Corporation Limited.
|
6 Days
|
IOCL Gujarat Refinery, Baroda.
|
Hiring of services for Mechanical maintenance of Static, Semi Rotary & Rotary equipment installed in ONGC Hazira.
|
3 Years
|
Oil & Natural Gas Commission. Hazira, Surat.
|